For a 22 x 32 yard lawn, you need 704 square yards of sod (or 6,336 square feet). This is the exact area, but you should order 5–10% extra to cover cutting waste, curves, and irregular edges, bringing the practical order to about 740–775 square yards.
Understanding Sod Measurements
Sod is sold in two common units: square feet (for small rolls or slabs) and square yards (for large pallets or big rolls). Most professional landscapers and sod farms quote prices per square yard, while home improvement stores often price per square foot. To avoid confusion, always convert to the same unit before comparing.
- 1 square yard = 9 square feet
- 1 acre = 4,840 square yards = 43,560 square feet
- A typical pallet of sod covers about 400–500 square feet (44–56 square yards), but this varies by farm and grass type.
Calculating the Area of Your Lawn
The basic formula for a rectangular lawn is length × width. In your case, 22 yards × 32 yards = 704 square yards. If your lawn is not a perfect rectangle, break it into smaller rectangles or triangles, calculate each area, and add them together. For a triangle, the area is (base × height) ÷ 2.
Why You Should Order Extra Sod
Sod is cut in strips, and you will inevitably have to trim pieces to fit around flower beds, trees, sprinkler heads, and along curved paths. These offcuts often cannot be reused because they are too small or have jagged edges. A 5–10% overage is standard practice. For 704 square yards, that means ordering 740–775 square yards. If your lawn has many obstacles or sharp angles, lean toward 10% (about 774 square yards).
Common Mistakes When Ordering Sod
- Mixing up yards and feet: 22 yards × 32 yards is not the same as 22 feet × 32 feet. One is 704 sq yd, the other is 704 sq ft (about 78 sq yd).
- Forgetting to subtract areas that won’t be sodded (house footprint, driveway, garden beds). Measure the actual lawn area, not the whole property.
- Ordering too little because you ignore waste. Running out mid-project is costly and leaves a visible seam.
- Not considering the shape: an L-shaped lawn needs more waste than a simple rectangle.
How to Measure Your Lawn Accurately
- Use a measuring wheel, long tape measure, or a satellite-based app to get the length and width in yards (or feet).
- Sketch your lawn on paper, dividing it into simple shapes.
- Calculate each shape’s area in square yards (if you measured in feet, divide by 9).
- Add all areas together to get the total.
- Multiply by 1.05 to 1.10 to account for waste.
What Affects the Amount of Sod You Need
- Lawn shape: straight edges waste less than curves.
- Obstacles: trees, sprinklers, and flower beds increase waste.
- Sod roll size: larger rolls can cover more area with fewer seams, but they are heavier and harder to handle.
- Installation pattern: staggering seams like bricks reduces waste compared to straight rows.
Cost and Budget Considerations
Sod prices vary widely by region, grass type, and season. As a general rule, you pay per square foot or per square yard. For 704 square yards, if the price is $0.50 per square foot, the material cost would be about $3,168 (6,336 sq ft × $0.50). Add installation labor if you are not doing it yourself, plus soil preparation, fertilizer, and water. Always get quotes from local suppliers and ask for a final price including delivery.
Frequently Asked Questions
How many pallets of sod do I need for 22×32 yards?
If a pallet covers 450 square feet (a common default), you need about 14 pallets (6,336 sq ft ÷ 450 = 14.08). With 10% waste, you’d need about 15 pallets. Check the exact coverage from your supplier.
Can I order sod by the square yard instead of square foot?
Yes, many sod farms sell by the square yard. For your lawn, that’s 704 square yards (plus waste). Just make sure the price is per square yard and not per roll.
What if my lawn is not a perfect rectangle?
Break it into rectangles and triangles, calculate each area, and sum them. Add 10% waste for irregular shapes. For example, if half is 22×32 and the other half is a triangle with base 10 yd and height 8 yd, add (10×8)/2 = 40 sq yd to the 704.
How long does sod take to install?
For a 704 sq yd lawn, a professional crew can lay it in one to two days, depending on crew size and terrain. DIY can take several days. Sod should be installed within 24–48 hours of delivery.
Should I order extra for seams and trimming?
Yes, always. Even a simple rectangle has seams, and you’ll need to cut pieces at the edges. A 5–10% overage is recommended; for a clean job, order at least 740 square yards.
Related
General steps for current mainstream versions; menus can differ by device and version. See the disclaimer or report an error.
More in this bed
- Square Footage Calculator: How to Calculate Sq Ft
- Rectangular Lamp Shades for Table Lamps
- Bare Spot Grass Seed: How to Fix Patches
- Home Depot Gate Latch Hardware: Types & Buying Guide
- Router Compatibility with myQ Wi-Fi Devices
- Home Flow Battery: What It Is and How It Works