Microsoft Planner Buckets: Create, Sort & Organize

Guide 10-53862 · Updated · Step by step

To create a bucket in Microsoft Planner, open your plan, select the plan, and click “Add bucket” next to the existing buckets, then type a name. To sort tasks within a bucket, drag and drop them into your preferred order, or use the “Sort” menu on the board to reorder by due date, priority, or other fields.

What Are Buckets in Microsoft Planner?

Buckets are the primary way to group tasks within a single Planner plan. Think of them as columns on a Kanban board—each bucket holds a set of related tasks, and you can name them to reflect categories, phases, workstreams, or team members. For example, a marketing plan might have buckets named “Content Creation,” “Design,” “Review,” and “Published.”

Every new plan starts with a single bucket called “To do.” You can rename it, add more buckets, or delete it if you prefer a different structure. Buckets are shared by everyone with access to the plan, so any member can add tasks to any bucket, move tasks between buckets, or reorder buckets themselves.

How to Create a Bucket

Creating a bucket is a quick, two-step process:

  1. Open your plan in Microsoft Planner (either in Microsoft 365, Teams, or the Planner app).
  2. Click the “+ Add bucket” button, which appears at the top of the board view, to the right of your last bucket.
  3. Type a name for the bucket and press Enter.

You can also create a bucket while adding a task: when you click “Add task,” you can choose an existing bucket or type a new bucket name directly in the “Bucket” field. That new bucket is created automatically.

There is no limit to the number of buckets you can have, but for readability, most teams keep between three and eight. Too many buckets can make the board feel cluttered, and too few can make it hard to distinguish task stages.

How to Sort Tasks Within a Bucket

Sorting tasks inside a bucket is a manual drag-and-drop operation by default. Simply click a task card and drag it up or down within the same bucket to change its vertical position. This order is saved for all members and is what you see on the board view.

If you want an automatic sort, use the “Sort” menu at the top right of the board. You can sort by:

  • Due date (oldest to newest)
  • Priority (Urgent, Important, Medium, Low)
  • Title (alphabetically)
  • Progress (Not started, In progress, Completed)
  • Assigned to (by person)

When you apply a sort, it overrides the manual order for the entire board, not just one bucket. To return to manual sorting, choose “Manual” from the same menu. Note that the sort applies to all buckets at once—you cannot sort only one bucket automatically.

How to Reorder Buckets on the Board

You can also reorder the buckets themselves. To move a bucket, click its name (or the three-dot menu next to it) and drag it left or right. The new order is saved for everyone. This is useful when you want the bucket sequence to reflect a workflow, like “To Do” → “In Progress” → “Done.”

If you have many buckets, dragging can be fiddly. An alternative is to use the “Group by bucket” view in the Charts or Schedule views, but those do not allow reordering—only the board view does. For a large plan, consider using the “Grid” view and grouping by bucket, which lets you collapse or expand bucket groups for easier navigation.

Common Problems and Fixes

One common issue is that the “Add bucket” button is missing. This happens when you are viewing the plan in a read-only mode or you lack edit permissions. Check that you are a member of the plan, not just a viewer. In Teams, you may need to open the Planner tab in a full editor rather than the compact view.

Another problem is that sorting by due date does not seem to work because tasks without due dates appear at the bottom. That is by design—tasks with no date are treated as having no date and are placed after all dated tasks. If you want them at the top, assign a due date or use a different sort field.

If you accidentally delete a bucket, the tasks inside it are not deleted—they are moved to the “To do” bucket automatically. You can then drag them back to a new bucket. However, if you delete a bucket with completed tasks, those tasks are also moved to “To do” but remain completed.

Comparing Buckets to Other Planner Features

Buckets are different from labels, which are colored tags you can apply to tasks for cross-cutting categories like “Budget” or “Client X.” While a task can have multiple labels, it can only belong to one bucket at a time. Buckets are also distinct from the “Progress” field, which tracks a task’s stage (Not started, In progress, Completed). Many teams use buckets for stages, but you can also use progress and keep buckets for workstreams.

In the newer Microsoft Planner (the unified app that combines Planner, To Do, and Tasks in Teams), buckets work the same way, but the interface may differ slightly. The core concepts remain: buckets are the top-level grouping in a plan, and tasks live inside them.

Best Practices for Organizing Tasks

To get the most out of buckets, consider these patterns:

  • By workflow stage: “Backlog,” “Ready,” “In Progress,” “Review,” “Done”—this matches a Kanban approach.
  • By team or person: “Design,” “Development,” “QA,” “Marketing”—useful when tasks are handed off.
  • By project phase: “Phase 1,” “Phase 2,” “Phase 3″—good for milestone-driven work.
  • By priority: “This Week,” “Next Week,” “Later”—works for personal task management.

Keep bucket names short and consistent. Avoid creating buckets that are too granular, like “Task 1,” “Task 2,” because that defeats the purpose of grouping. Instead, use buckets for categories and rely on labels, due dates, and checklists within tasks for finer detail.

Frequently Asked Questions

Can I sort tasks within a bucket alphabetically? Yes, use the “Sort” menu on the board and choose “Title”. This sorts all tasks in all buckets alphabetically. To return to manual order, choose “Manual”.

How do I move a task to another bucket? Drag the task card to the desired bucket on the board. Alternatively, open the task, click the “Bucket” field, and select a different bucket from the dropdown.

What happens if I delete a bucket? The bucket is removed, and all tasks in it are moved to the default “To do” bucket. No tasks are permanently deleted. You can then drag them to another bucket.

Can I have the same task in two buckets? No. A task can belong to only one bucket at a time. If you need to categorize a task in multiple ways, use labels instead.

Why can’t I see the “Add bucket” button? You likely have view-only permissions. Ask the plan owner to grant you edit access. In Teams, ensure you are on the Planner tab and not a read-only view.

Does sorting by priority work across buckets? Yes, the “Sort” menu applies to the entire board, so tasks in all buckets are sorted by the selected field. The bucket grouping remains, but tasks within each bucket are reordered.